FR | EN
GET IT RIGHT !

DETAILED INSPECTION REPORT

After the inspection of the property, INSPECTIONS PREMIUM will submit you a detailed report in the next 24 to 48 hours.
This report will consist of:
-
all of which was observed and examined by the inspector;
-
the impossibility to start up certain devices;
-
the observation of any sign of water infiltration in the building or significant condensation on components of the building;
-
a summary of the elements that require an immediate or major repair or that represent a dangerous situation;
-
photos to illustrate the conditions of all components;
-
any other information or observation noted during the inspection.

STRUCTURE
We shall give you an accurate view of the systems and the structural components, including:
-
the foundations;
-
floors;
-
walls;
-
Beam and posts;
-
ceilings;
-
roof.

OUTSIDE
We shall give you an accurate view of:
-
the outer wall covers;
-
windows and doors;
-
projections (terraces, balconies, flights of steps, etc.);
-
fronts-roofs, including fascias and sub-faces;
-
the vegetation, the slopes of the ground, the streaming of waters, entrance of garage, entrance pavement.

ROOF
We shall give you an accurate view of:
-
the roof cover;
-
water evacuation system;
-
solins;
-
lanterns, outside of fireplaces and emergences.

PLUMBING
We shall give you an accurate view of:
-
pipes condition and water distribution;
-
devices and faucets;
-
the functional debit of water;
-
the possible leaks;
-
the harmful connections.

ÉLECTRICITY
We shall give you an accurate view of:
-
the service entrance;
-
the device of general protection, the main panel and the side panels of distribution and their location;
-
the nominal intensity and the tension of the installation;
-
the functioning of a representative number of installed devices of lighting, switches and plugs;
-
the polarity and the ground of all the placed plugs: near the internal devices of plumbing; in the garage or the shelter of automobile; on the outer walls of the inspected buildings;
-
the functioning of the differential circuit breakers.
Note: the inspector has to indicate the presence of any aluminum cable in the circuits of diversion.

HEATING
We shall give you an accurate view of:
-
the main generator of heat and its source of energy;
-
the heat distribution system;
-
the usual mechanisms of putting on;
-
the automatic devices of safety;
-
the presence of sources of heat in every livable room.

INSIDE
We shall give you an accurate view of:
-
walls, floors and ceilings;
-
steps, staircases, balconies;
-
cupboards and counters;
-
windows and doors, including those separating the livable spaces and a garage;
-
walls, doors and ceilings separating the livable spaces and a garage

INSULATION
We shall give you an accurate view of:
-
the insulation of the not finished attic;
-
the presence of vapor barrier;
-
the ventilation of the attic;
-
the type of insulation;
-
the clearance for combustible materials around the fireplace.